20T Double Girder EOT Crane

EOT-2026-041 · Tata Steel — Jamshedpur · 20/5T DG EOT, span 22.5m, VFD controls

Progress
70%
Tasks done
14/23
Overdue
4
Blocked
2
Delivery
02 Nov
started 07 Oct
planned progress overdue today delivery
Task
Oct 2026
Nov 2026
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
Main Girder (Box Type)Fabrication
Plate & section procurementSuresh, Imran
100%
3/3
Cutting plan & nestingSuresh, Imran
50%
1/2
Cutting & web/flange prepSuresh, Imran
100%
4/4
Girder fit-up & weldingSuresh, Imran
100%
4/4
Weld inspection (DPT/UT)Suresh, Imran, Pooja
100%
3/3
End CarriageFabrication
End carriage fabricationSuresh, Imran
100%
4/4
Dimensional checkSuresh, Imran, Pooja
1/2
Wheel AssemblyMachining
Forged wheel blanksMahesh
100%
2/2
Wheel turning & boringMahesh
50%
2/4
Shaft machiningMahesh
100%
3/3
Wheel & bearing assemblyMahesh
100%
2/2
Hoist DrumMachining
Drum groovingMahesh
100%
3/3
Groove profile inspectionMahesh, Pooja
2/2
Control PanelElectrical
Panel GA & wiring drawingVikram
100%
2/2
Switchgear & VFD procurementVikram
100%
3/3
Panel wiringVikram
100%
3/3
Panel testingVikram
67%
2/3
DSL / Festoon SystemElectrical
Festoon cabling & trolleysVikram
100%
3/3
Girder PaintingPainting
Shot blasting (SA 2.5)Deepak
0%
0/2
Primer + intermediate + finish coatsDeepak
0%
0/3
DFT checkDeepak, Pooja
0/2
Dispatch PackageDispatch
Dispatch documentsRamesh
0%
0/4
Packing & loadingRamesh
0%