Follow-ups at 18:00 · replies collected 17:00–21:00 · processed at 21:00 (IST)
Message log6 replies waiting for the 21:00 batch
- → Imran Khan · Receipt · 21 Oct, 12:58 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Imran Khan → · Reply · 21 Oct, 12:57 pm· waiting for batch2 aur 5 ho gaya, 1 nahi hua kyunki vendor ne supply kal tak bola hai, 3 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi
- → Mahesh Patil · Receipt · 21 Oct, 12:55 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Mahesh Patil → · Reply · 21 Oct, 12:54 pm· waiting for batch1 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi
- → Vikram Singh · Receipt · 21 Oct, 12:52 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Vikram Singh → · Reply · 21 Oct, 12:51 pm· waiting for batch2 me sirf c baaki hai, 1 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye
- → Deepak Kumar · Receipt · 21 Oct, 12:49 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Deepak Kumar → · Reply · 21 Oct, 12:48 pm· waiting for batch1 nahi hua kyunki vendor ne supply kal tak bola hai
- → Pooja Nair · Receipt · 21 Oct, 12:46 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Pooja Nair → · Reply · 21 Oct, 12:45 pm· waiting for batch1 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye
- → Suresh Yadav · Receipt · 21 Oct, 12:01 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Suresh Yadav → · Reply · 21 Oct, 12:00 pm· waiting for batch4 me a ho gaya, 1 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye, 3 nahi hua kyunki vendor ne supply kal tak bola hai, 5 nahi hua kyunki final welding baaki hai
- → Pooja Nair · Follow-up · 21 Oct, 11:22 am· simulatedPooja, apne kaam ki update do (21 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 24 din late a) DFT readings recorded b) Touch-up 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 6 din late a) Wheel base check ✅ b) Diagonal check Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Deepak Kumar · Follow-up · 21 Oct, 11:22 am· simulatedDeepak, apne kaam ki update do (21 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 24 din late a) DFT readings recorded b) Touch-up Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Vikram Singh · Follow-up · 21 Oct, 11:21 am· simulatedVikram, apne kaam ki update do (21 Oct). ⚠️ *Late* — reason bhi batao: 1. *Panel testing* — Control Panel (EOT-2026-041) · ⚠️ 1 din late a) IR test ✅ b) Function test ✅ c) VFD parameter setting *Baaki:* 2. *Switchgear & VFD procurement* — Control Panel (EOT-2026-047) a) VFDs received ✅ b) Contactors & MCBs received c) Cables received Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Mahesh Patil · Follow-up · 21 Oct, 11:21 am· simulatedMahesh, apne kaam ki update do (21 Oct). ⚠️ *Late* — reason bhi batao: 1. *Wheel turning & boring* — Wheel Assembly (EOT-2026-041) · ⚠️ 6 din late a) Rough turning ✅ b) Boring ✅ c) Finish turning d) Keyway Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Imran Khan · Follow-up · 21 Oct, 11:21 am· simulatedImran, apne kaam ki update do (21 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 11 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 6 din late a) Wheel base check ✅ b) Diagonal check 3. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) · ⚠️ 1 din late a) PO released ✅ b) Plates received ✅ c) MTC verified *Baaki:* 4. *Cutting & web/flange prep* — Main Girder (Box Type) (EOT-2026-047) a) Flange plates cut b) Web plates cut c) Diaphragms cut d) Edge bevelling 5. *End carriage fabrication* — End Carriage (EOT-2026-047) a) Cutting ✅ b) Fit-up c) Welding d) Stress relieving Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Suresh Yadav · Follow-up · 21 Oct, 11:21 am· simulatedSuresh, apne kaam ki update do (21 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 11 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 6 din late a) Wheel base check ✅ b) Diagonal check 3. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) · ⚠️ 1 din late a) PO released ✅ b) Plates received ✅ c) MTC verified *Baaki:* 4. *Cutting & web/flange prep* — Main Girder (Box Type) (EOT-2026-047) a) Flange plates cut b) Web plates cut c) Diaphragms cut d) Edge bevelling 5. *End carriage fabrication* — End Carriage (EOT-2026-047) a) Cutting ✅ b) Fit-up c) Welding d) Stress relieving Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Anil Verma · Report · 20 Oct, 09:06 pm· simulatedProduction report — 20 Oct 17/59 tasks complete (29%). 7 in progress, 35 not started, 0 blocked. Today: 3 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: material not received yet; Dimensional check — Suresh Yadav: machine was down, maintenance came today; Plate & section procurement — Suresh Yadav: final welding still pending; Cutting plan & nesting — Imran Khan: drawing revision pending from design; Dimensional check — Imran Khan: vendor promised supply by tomorrow; Wheel turning & boring — Mahesh Patil: operator was on leave ↔️ Answers differ (kept open): Plate & section procurement — Suresh Yadav: not done, Imran Khan: done • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 6/10 done, avg 65%, 1 overdue • Fabrication: 6/21 done, avg 38%, 2 overdue • Electrical: 5/13 done, avg 46%
- → Rajesh Sharma · Report · 20 Oct, 09:06 pm· simulatedProduction report — 20 Oct 17/59 tasks complete (29%). 7 in progress, 35 not started, 0 blocked. Today: 3 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: material not received yet; Dimensional check — Suresh Yadav: machine was down, maintenance came today; Plate & section procurement — Suresh Yadav: final welding still pending; Cutting plan & nesting — Imran Khan: drawing revision pending from design; Dimensional check — Imran Khan: vendor promised supply by tomorrow; Wheel turning & boring — Mahesh Patil: operator was on leave ↔️ Answers differ (kept open): Plate & section procurement — Suresh Yadav: not done, Imran Khan: done • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 6/10 done, avg 65%, 1 overdue • Fabrication: 6/21 done, avg 38%, 2 overdue • Electrical: 5/13 done, avg 46%
- → Pooja Nair · Confirmation · 20 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (material abhi tak nahi aaya), 2 ❌ (machine kharab thi, maintenance wale aaj aaye), 3 ✅.
- → Deepak Kumar · Confirmation · 20 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (drawing revision pending hai design se).
- → Vikram Singh · Confirmation · 20 Oct, 09:01 pm· simulatedNote kiya: 1 🔄 67%, 2 🔄 33%.
- → Mahesh Patil · Confirmation · 20 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (operator chutti pe tha), 2 ✅.
- → Imran Khan · Confirmation · 20 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (drawing revision pending hai design se), 2 ❌ (vendor ne supply kal tak bola hai), 3 ✅, 4 ✅, 5 ✅, 6 🔄 25%.
- → Suresh Yadav · Confirmation · 20 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (material abhi tak nahi aaya), 2 ❌ (machine kharab thi, maintenance wale aaj aaye), 3 ❌ (final welding baaki hai), 4 ✅, 5 ✅, 6 🔄 25%.
- → Imran Khan · Receipt · 20 Oct, 08:19 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Imran Khan → · Reply · 20 Oct, 08:19 pm· processed 20 Oct, 09:00 pm3 aur 4 aur 5 ho gaya, 6 me a ho gaya, 1 nahi hua kyunki drawing revision pending hai design se, 2 nahi hua kyunki vendor ne supply kal tak bola hai
- → Vikram Singh · Receipt · 20 Oct, 08:09 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Vikram Singh → · Reply · 20 Oct, 08:09 pm· processed 20 Oct, 09:00 pm1 me sirf c baaki hai, 2 me a ho gaya
- → Deepak Kumar · Receipt · 20 Oct, 07:07 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Deepak Kumar → · Reply · 20 Oct, 07:07 pm· processed 20 Oct, 09:00 pm1 nahi hua kyunki drawing revision pending hai design se
- → Mahesh Patil · Receipt · 20 Oct, 06:50 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Mahesh Patil → · Reply · 20 Oct, 06:50 pm· processed 20 Oct, 09:00 pm2 ho gaya, 1 nahi hua kyunki operator chutti pe tha
- → Pooja Nair · Receipt · 20 Oct, 06:49 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Pooja Nair → · Reply · 20 Oct, 06:49 pm· processed 20 Oct, 09:00 pm1 aur 2 ko chhod ke sab ho gaya. 1 late hai kyunki material abhi tak nahi aaya. 2 late hai kyunki machine kharab thi, maintenance wale aaj aaye
- → Suresh Yadav · Receipt · 20 Oct, 06:27 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Suresh Yadav → · Reply · 20 Oct, 06:27 pm· processed 20 Oct, 09:00 pm4 aur 5 ho gaya, 6 me a ho gaya, 1 nahi hua kyunki material abhi tak nahi aaya, 2 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye, 3 nahi hua kyunki final welding baaki hai
- → Pooja Nair · Follow-up · 20 Oct, 06:02 pm· simulatedPooja, apne kaam ki update do (20 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 23 din late a) DFT readings recorded b) Touch-up 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 5 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Weld inspection (DPT/UT)* — Main Girder (Box Type) (EOT-2026-041) a) Visual inspection b) DPT c) UT report Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Deepak Kumar · Follow-up · 20 Oct, 06:02 pm· simulatedDeepak, apne kaam ki update do (20 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 23 din late a) DFT readings recorded b) Touch-up Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Vikram Singh · Follow-up · 20 Oct, 06:02 pm· simulatedVikram, apne kaam ki update do (20 Oct). 1. *Panel testing* — Control Panel (EOT-2026-041) a) IR test ✅ b) Function test c) VFD parameter setting 2. *Switchgear & VFD procurement* — Control Panel (EOT-2026-047) a) VFDs received b) Contactors & MCBs received c) Cables received Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Mahesh Patil · Follow-up · 20 Oct, 06:02 pm· simulatedMahesh, apne kaam ki update do (20 Oct). ⚠️ *Late* — reason bhi batao: 1. *Wheel turning & boring* — Wheel Assembly (EOT-2026-041) · ⚠️ 5 din late a) Rough turning ✅ b) Boring ✅ c) Finish turning d) Keyway *Baaki:* 2. *Forged wheel blanks* — Wheel Assembly (EOT-2026-047) a) PO released ✅ b) Blanks received Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Imran Khan · Follow-up · 20 Oct, 06:02 pm· simulatedImran, apne kaam ki update do (20 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 10 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 5 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) a) PO released ✅ b) Plates received c) MTC verified 4. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-047) a) Nesting drawing approved ✅ b) Plates marked 5. *Weld inspection (DPT/UT)* — Main Girder (Box Type) (EOT-2026-041) a) Visual inspection b) DPT c) UT report 6. *End carriage fabrication* — End Carriage (EOT-2026-047) a) Cutting b) Fit-up c) Welding d) Stress relieving Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Suresh Yadav · Follow-up · 20 Oct, 06:02 pm· simulatedSuresh, apne kaam ki update do (20 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 10 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 5 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) a) PO released ✅ b) Plates received c) MTC verified 4. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-047) a) Nesting drawing approved ✅ b) Plates marked 5. *Weld inspection (DPT/UT)* — Main Girder (Box Type) (EOT-2026-041) a) Visual inspection b) DPT c) UT report 6. *End carriage fabrication* — End Carriage (EOT-2026-047) a) Cutting b) Fit-up c) Welding d) Stress relieving Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Anil Verma · Report · 19 Oct, 09:06 pm· simulatedProduction report — 19 Oct 14/59 tasks complete (24%). 7 in progress, 38 not started, 0 blocked. Today: 2 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: shop crane was busy on another job; Dimensional check — Suresh Yadav: material not received yet; Cutting plan & nesting — Imran Khan: machine was down, maintenance came today; Dimensional check — Imran Khan: drawing revision pending from design; Wheel turning & boring — Mahesh Patil: vendor promised supply by tomorrow; DFT check — Deepak Kumar: machine was down, maintenance came today • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 5/10 done, avg 60%, 1 overdue • Fabrication: 4/21 done, avg 28%, 2 overdue • Electrical: 5/13 done, avg 41%
- → Rajesh Sharma · Report · 19 Oct, 09:06 pm· simulatedProduction report — 19 Oct 14/59 tasks complete (24%). 7 in progress, 38 not started, 0 blocked. Today: 2 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: shop crane was busy on another job; Dimensional check — Suresh Yadav: material not received yet; Cutting plan & nesting — Imran Khan: machine was down, maintenance came today; Dimensional check — Imran Khan: drawing revision pending from design; Wheel turning & boring — Mahesh Patil: vendor promised supply by tomorrow; DFT check — Deepak Kumar: machine was down, maintenance came today • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 5/10 done, avg 60%, 1 overdue • Fabrication: 4/21 done, avg 28%, 2 overdue • Electrical: 5/13 done, avg 41%
- → Pooja Nair · Confirmation · 19 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (crane free nahi thi, dusre job pe lagi thi), 2 ❌ (material abhi tak nahi aaya).
- → Deepak Kumar · Confirmation · 19 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (machine kharab thi, maintenance wale aaj aaye).
- → Vikram Singh · Confirmation · 19 Oct, 09:01 pm· simulatedNote kiya: 1 ✅, 2 🔄 33%.
- → Mahesh Patil · Confirmation · 19 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (vendor ne supply kal tak bola hai).
- → Imran Khan · Confirmation · 19 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (machine kharab thi, maintenance wale aaj aaye), 2 ❌ (drawing revision pending hai design se), 3 ✅, 5 🔄 50%.
- → Suresh Yadav · Confirmation · 19 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (crane free nahi thi, dusre job pe lagi thi), 2 ❌ (material abhi tak nahi aaya), 3 ✅, 5 🔄 50%.
- → Mahesh Patil · Receipt · 19 Oct, 08:38 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Mahesh Patil → · Reply · 19 Oct, 08:38 pm· processed 19 Oct, 09:00 pm1 nahi hua kyunki vendor ne supply kal tak bola hai
- → Vikram Singh · Receipt · 19 Oct, 08:28 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Vikram Singh → · Reply · 19 Oct, 08:28 pm· processed 19 Oct, 09:00 pm1 ho gaya, 2 me a ho gaya
- → Suresh Yadav · Receipt · 19 Oct, 08:20 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Suresh Yadav → · Reply · 19 Oct, 08:20 pm· processed 19 Oct, 09:00 pm3 ho gaya, 5 me sirf b baaki hai, 1 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi, 2 nahi hua kyunki material abhi tak nahi aaya
- → Pooja Nair · Receipt · 19 Oct, 08:03 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Pooja Nair → · Reply · 19 Oct, 08:03 pm· processed 19 Oct, 09:00 pm1 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi, 2 nahi hua kyunki material abhi tak nahi aaya
- → Imran Khan · Receipt · 19 Oct, 07:29 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Imran Khan → · Reply · 19 Oct, 07:29 pm· processed 19 Oct, 09:00 pm3 ho gaya, 5 me sirf b baaki hai, 1 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye, 2 nahi hua kyunki drawing revision pending hai design se
- → Deepak Kumar · Receipt · 19 Oct, 07:00 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Deepak Kumar → · Reply · 19 Oct, 07:00 pm· processed 19 Oct, 09:00 pm1 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye
- → Pooja Nair · Follow-up · 19 Oct, 06:02 pm· simulatedPooja, apne kaam ki update do (19 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 22 din late a) DFT readings recorded b) Touch-up 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 4 din late a) Wheel base check ✅ b) Diagonal check Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Deepak Kumar · Follow-up · 19 Oct, 06:02 pm· simulatedDeepak, apne kaam ki update do (19 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 22 din late a) DFT readings recorded b) Touch-up Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Vikram Singh · Follow-up · 19 Oct, 06:02 pm· simulatedVikram, apne kaam ki update do (19 Oct). 1. *Panel GA & wiring drawing* — Control Panel (EOT-2026-047) a) GA approved ✅ b) Wiring diagram approved 2. *Panel testing* — Control Panel (EOT-2026-041) a) IR test b) Function test c) VFD parameter setting 3. *Switchgear & VFD procurement* — Control Panel (EOT-2026-047) a) VFDs received b) Contactors & MCBs received c) Cables received Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Mahesh Patil · Follow-up · 19 Oct, 06:02 pm· simulatedMahesh, apne kaam ki update do (19 Oct). ⚠️ *Late* — reason bhi batao: 1. *Wheel turning & boring* — Wheel Assembly (EOT-2026-041) · ⚠️ 4 din late a) Rough turning ✅ b) Boring ✅ c) Finish turning d) Keyway *Baaki:* 2. *Forged wheel blanks* — Wheel Assembly (EOT-2026-047) a) PO released ✅ b) Blanks received Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Imran Khan · Follow-up · 19 Oct, 06:02 pm· simulatedImran, apne kaam ki update do (19 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 9 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 4 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Girder fit-up & welding* — Main Girder (Box Type) (EOT-2026-041) a) Diaphragm fit-up ✅ b) Box closing ✅ c) Longitudinal welding ✅ d) Camber check 4. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) a) PO released ✅ b) Plates received c) MTC verified 5. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-047) a) Nesting drawing approved b) Plates marked Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Suresh Yadav · Follow-up · 19 Oct, 06:02 pm· simulatedSuresh, apne kaam ki update do (19 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 9 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 4 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Girder fit-up & welding* — Main Girder (Box Type) (EOT-2026-041) a) Diaphragm fit-up ✅ b) Box closing ✅ c) Longitudinal welding ✅ d) Camber check 4. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) a) PO released ✅ b) Plates received c) MTC verified 5. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-047) a) Nesting drawing approved b) Plates marked Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Anil Verma · Report · 17 Oct, 09:06 pm· simulatedProduction report — 17 Oct 12/59 tasks complete (20%). 7 in progress, 40 not started, 0 blocked. Today: 4 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: operator was on leave; Dimensional check — Suresh Yadav: shop crane was busy on another job; Cutting plan & nesting — Imran Khan: material not received yet; Dimensional check — Imran Khan: machine was down, maintenance came today; Wheel turning & boring — Mahesh Patil: drawing revision pending from design; DFT check — Deepak Kumar: material not received yet • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 5/10 done, avg 60%, 1 overdue • Fabrication: 3/21 done, avg 24%, 2 overdue • Electrical: 4/13 done, avg 35%
- → Rajesh Sharma · Report · 17 Oct, 09:06 pm· simulatedProduction report — 17 Oct 12/59 tasks complete (20%). 7 in progress, 40 not started, 0 blocked. Today: 4 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: operator was on leave; Dimensional check — Suresh Yadav: shop crane was busy on another job; Cutting plan & nesting — Imran Khan: material not received yet; Dimensional check — Imran Khan: machine was down, maintenance came today; Wheel turning & boring — Mahesh Patil: drawing revision pending from design; DFT check — Deepak Kumar: material not received yet • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 5/10 done, avg 60%, 1 overdue • Fabrication: 3/21 done, avg 24%, 2 overdue • Electrical: 4/13 done, avg 35%
- → Pooja Nair · Confirmation · 17 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (operator chutti pe tha), 2 ❌ (crane free nahi thi, dusre job pe lagi thi), 3 ✅.
- → Deepak Kumar · Confirmation · 17 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (material abhi tak nahi aaya).
- → Vikram Singh · Confirmation · 17 Oct, 09:01 pm· simulatedNote kiya: 1 ✅, 2 ✅, 3 🔄 50%.
- → Mahesh Patil · Confirmation · 17 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (drawing revision pending hai design se), 2 ✅, 3 ✅, 4 🔄 50%.
- → Imran Khan · Confirmation · 17 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (material abhi tak nahi aaya), 2 ❌ (machine kharab thi, maintenance wale aaj aaye), 4 🔄 33%.
- → Suresh Yadav · Confirmation · 17 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (operator chutti pe tha), 2 ❌ (crane free nahi thi, dusre job pe lagi thi), 4 🔄 33%.
- → Deepak Kumar · Receipt · 17 Oct, 08:28 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Deepak Kumar → · Reply · 17 Oct, 08:28 pm· processed 17 Oct, 09:00 pm1 nahi hua kyunki material abhi tak nahi aaya
- → Mahesh Patil · Receipt · 17 Oct, 08:10 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Mahesh Patil → · Reply · 17 Oct, 08:10 pm· processed 17 Oct, 09:00 pm2 aur 3 ho gaya, 4 me sirf b baaki hai, 1 nahi hua kyunki drawing revision pending hai design se
- → Vikram Singh · Receipt · 17 Oct, 07:38 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Vikram Singh → · Reply · 17 Oct, 07:38 pm· processed 17 Oct, 09:00 pm1 aur 2 ho gaya, 3 me sirf b baaki hai
- → Suresh Yadav · Receipt · 17 Oct, 07:22 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Suresh Yadav → · Reply · 17 Oct, 07:22 pm· processed 17 Oct, 09:00 pm4 me a ho gaya, 1 nahi hua kyunki operator chutti pe tha, 2 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi
- → Pooja Nair · Receipt · 17 Oct, 07:18 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Pooja Nair → · Reply · 17 Oct, 07:18 pm· processed 17 Oct, 09:00 pm1 aur 2 ko chhod ke sab ho gaya. 1 late hai kyunki operator chutti pe tha. 2 late hai kyunki crane free nahi thi, dusre job pe lagi thi
- → Imran Khan · Receipt · 17 Oct, 06:20 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Imran Khan → · Reply · 17 Oct, 06:20 pm· processed 17 Oct, 09:00 pm4 me a ho gaya, 1 nahi hua kyunki material abhi tak nahi aaya, 2 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye
- → Pooja Nair · Follow-up · 17 Oct, 06:02 pm· simulatedPooja, apne kaam ki update do (17 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 20 din late a) DFT readings recorded b) Touch-up 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 2 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Groove profile inspection* — Hoist Drum (EOT-2026-041) a) Pitch check b) Groove radius check Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Deepak Kumar · Follow-up · 17 Oct, 06:02 pm· simulatedDeepak, apne kaam ki update do (17 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 20 din late a) DFT readings recorded b) Touch-up Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Vikram Singh · Follow-up · 17 Oct, 06:01 pm· simulatedVikram, apne kaam ki update do (17 Oct). 1. *Panel wiring* — Control Panel (EOT-2026-041) a) Power wiring ✅ b) Control wiring ✅ c) Ferruling & dressing 2. *Festoon cabling & trolleys* — DSL / Festoon System (EOT-2026-041) a) Cable cutting b) Trolley assembly ✅ c) Termination 3. *Panel GA & wiring drawing* — Control Panel (EOT-2026-047) a) GA approved b) Wiring diagram approved Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Mahesh Patil · Follow-up · 17 Oct, 06:01 pm· simulatedMahesh, apne kaam ki update do (17 Oct). ⚠️ *Late* — reason bhi batao: 1. *Wheel turning & boring* — Wheel Assembly (EOT-2026-041) · ⚠️ 2 din late a) Rough turning ✅ b) Boring ✅ c) Finish turning d) Keyway *Baaki:* 2. *Wheel & bearing assembly* — Wheel Assembly (EOT-2026-041) a) Bearing fitting ✅ b) Run-out check 3. *Groove profile inspection* — Hoist Drum (EOT-2026-041) a) Pitch check b) Groove radius check 4. *Forged wheel blanks* — Wheel Assembly (EOT-2026-047) a) PO released b) Blanks received Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Imran Khan · Follow-up · 17 Oct, 06:01 pm· simulatedImran, apne kaam ki update do (17 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 7 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 2 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Girder fit-up & welding* — Main Girder (Box Type) (EOT-2026-041) a) Diaphragm fit-up ✅ b) Box closing ✅ c) Longitudinal welding ✅ d) Camber check 4. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) a) PO released b) Plates received c) MTC verified Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Suresh Yadav · Follow-up · 17 Oct, 06:01 pm· simulatedSuresh, apne kaam ki update do (17 Oct). ⚠️ *Late* — reason bhi batao: 1. *Cutting plan & nesting* — Main Girder (Box Type) (EOT-2026-041) · ⚠️ 7 din late a) Nesting drawing approved ✅ b) Plates marked 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 2 din late a) Wheel base check ✅ b) Diagonal check *Baaki:* 3. *Girder fit-up & welding* — Main Girder (Box Type) (EOT-2026-041) a) Diaphragm fit-up ✅ b) Box closing ✅ c) Longitudinal welding ✅ d) Camber check 4. *Plate & section procurement* — Main Girder (Box Type) (EOT-2026-047) a) PO released b) Plates received c) MTC verified Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Anil Verma · Report · 16 Oct, 09:06 pm· simulatedProduction report — 16 Oct 8/59 tasks complete (14%). 7 in progress, 44 not started, 0 blocked. Today: 1 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: vendor promised supply by tomorrow; Dimensional check — Suresh Yadav: operator was on leave; Cutting plan & nesting — Imran Khan: shop crane was busy on another job; Dimensional check — Imran Khan: material not received yet; Wheel turning & boring — Mahesh Patil: machine was down, maintenance came today; DFT check — Deepak Kumar: shop crane was busy on another job • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 3/10 done, avg 40%, 1 overdue • Fabrication: 3/21 done, avg 23%, 2 overdue • Electrical: 2/13 done, avg 23%
- → Rajesh Sharma · Report · 16 Oct, 09:06 pm· simulatedProduction report — 16 Oct 8/59 tasks complete (14%). 7 in progress, 44 not started, 0 blocked. Today: 1 task(s) completed · replies from 6/6 people followed up. ⚠️ 3 overdue: Cutting plan & nesting (20T Double Girder EOT Crane, 50%) — Imran: drawing revision pending from design; Wheel turning & boring (20T Double Girder EOT Crane, 50%) — Mahesh: operator was on leave; Dimensional check (20T Double Girder EOT Crane, 50%) — Pooja: machine was down, maintenance came today 📝 Reasons given: Cutting plan & nesting — Suresh Yadav: vendor promised supply by tomorrow; Dimensional check — Suresh Yadav: operator was on leave; Cutting plan & nesting — Imran Khan: shop crane was busy on another job; Dimensional check — Imran Khan: material not received yet; Wheel turning & boring — Mahesh Patil: machine was down, maintenance came today; DFT check — Deepak Kumar: shop crane was busy on another job • Painting: 0/9 done, avg 0% • Dispatch: 0/6 done, avg 0% • Machining: 3/10 done, avg 40%, 1 overdue • Fabrication: 3/21 done, avg 23%, 2 overdue • Electrical: 2/13 done, avg 23%
- → Pooja Nair · Confirmation · 16 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (vendor ne supply kal tak bola hai), 2 ❌ (operator chutti pe tha).
- → Deepak Kumar · Confirmation · 16 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (crane free nahi thi, dusre job pe lagi thi).
- → Vikram Singh · Confirmation · 16 Oct, 09:01 pm· simulatedNote kiya: 1 🔄 67%, 2 🔄 33%.
- → Mahesh Patil · Confirmation · 16 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (machine kharab thi, maintenance wale aaj aaye), 2 ✅, 3 🔄 50%.
- → Imran Khan · Confirmation · 16 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (crane free nahi thi, dusre job pe lagi thi), 2 ❌ (material abhi tak nahi aaya), 3 🔄 75%.
- → Suresh Yadav · Confirmation · 16 Oct, 09:01 pm· simulatedNote kiya: 1 ❌ (vendor ne supply kal tak bola hai), 2 ❌ (operator chutti pe tha), 3 🔄 75%.
- → Mahesh Patil · Receipt · 16 Oct, 08:44 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Mahesh Patil → · Reply · 16 Oct, 08:44 pm· processed 16 Oct, 09:00 pm2 ho gaya, 3 me sirf b baaki hai, 1 nahi hua kyunki machine kharab thi, maintenance wale aaj aaye
- → Deepak Kumar · Receipt · 16 Oct, 08:33 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Deepak Kumar → · Reply · 16 Oct, 08:33 pm· processed 16 Oct, 09:00 pm1 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi
- → Imran Khan · Receipt · 16 Oct, 07:50 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Imran Khan → · Reply · 16 Oct, 07:50 pm· processed 16 Oct, 09:00 pm3 me sirf d baaki hai, 1 nahi hua kyunki crane free nahi thi, dusre job pe lagi thi, 2 nahi hua kyunki material abhi tak nahi aaya
- → Pooja Nair · Receipt · 16 Oct, 07:31 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Pooja Nair → · Reply · 16 Oct, 07:31 pm· processed 16 Oct, 09:00 pm1 nahi hua kyunki vendor ne supply kal tak bola hai, 2 nahi hua kyunki operator chutti pe tha
- → Vikram Singh · Receipt · 16 Oct, 06:45 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Vikram Singh → · Reply · 16 Oct, 06:45 pm· processed 16 Oct, 09:00 pm1 me sirf c baaki hai, 2 me b ho gaya
- → Suresh Yadav · Receipt · 16 Oct, 06:42 pm· simulatedMil gaya. 9 baje record hoga — aur kuch ho to abhi bhej do.
- Suresh Yadav → · Reply · 16 Oct, 06:42 pm· processed 16 Oct, 09:00 pm3 me sirf d baaki hai, 1 nahi hua kyunki vendor ne supply kal tak bola hai, 2 nahi hua kyunki operator chutti pe tha
- → Pooja Nair · Follow-up · 16 Oct, 06:01 pm· simulatedPooja, apne kaam ki update do (16 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 19 din late a) DFT readings recorded b) Touch-up 2. *Dimensional check* — End Carriage (EOT-2026-041) · ⚠️ 1 din late a) Wheel base check ✅ b) Diagonal check Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Deepak Kumar · Follow-up · 16 Oct, 06:01 pm· simulatedDeepak, apne kaam ki update do (16 Oct). ⚠️ *Late* — reason bhi batao: 1. *DFT check* — Girder Painting (GC-2026-033) · ⚠️ 19 din late a) DFT readings recorded b) Touch-up Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Vikram Singh · Follow-up · 16 Oct, 06:01 pm· simulatedVikram, apne kaam ki update do (16 Oct). 1. *Panel wiring* — Control Panel (EOT-2026-041) a) Power wiring ✅ b) Control wiring c) Ferruling & dressing 2. *Festoon cabling & trolleys* — DSL / Festoon System (EOT-2026-041) a) Cable cutting b) Trolley assembly c) Termination Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
- → Mahesh Patil · Follow-up · 16 Oct, 06:01 pm· simulatedMahesh, apne kaam ki update do (16 Oct). ⚠️ *Late* — reason bhi batao: 1. *Wheel turning & boring* — Wheel Assembly (EOT-2026-041) · ⚠️ 1 din late a) Rough turning ✅ b) Boring ✅ c) Finish turning d) Keyway *Baaki:* 2. *Drum grooving* — Hoist Drum (EOT-2026-041) a) Facing ✅ b) Rope grooving ✅ c) Flange boring 3. *Wheel & bearing assembly* — Wheel Assembly (EOT-2026-041) a) Bearing fitting b) Run-out check Number se batao kya hua kya nahi — jaise "1 ho gaya, 2 me a, b ho gaya, 3 nahi" ya "3 chhod ke sab ho gaya". 9 baje tak.
Reply simulator
Send a message as an employee. Like a real WhatsApp reply it is only saved; replies between 17:00 and 21:00 are read together by the 21:00 batch. Use “Process now” to run that batch immediately.
Today's numbered list sent to Deepak
1. DFT check (GC-2026-033) · 24 din late
a) DFT readings recordedb) Touch-up
Recent batch runs
- 20 Oct, 09:00 pm (cron)6 msgs · 6 people · 11 tasks
- 19 Oct, 09:00 pm (cron)6 msgs · 6 people · 8 tasks
- 17 Oct, 09:00 pm (cron)6 msgs · 6 people · 11 tasks
- 16 Oct, 09:00 pm (cron)6 msgs · 6 people · 9 tasks
- 15 Oct, 09:00 pm (cron)5 msgs · 5 people · 6 tasks
Integration status
- ●Meta Cloud API credentialsWHATSAPP_TOKEN + WHATSAPP_PHONE_NUMBER_ID
- ●Follow-up templateWHATSAPP_TEMPLATE_NAME = protask_daily_update
- ●Report templateWHATSAPP_REPORT_TEMPLATE_NAME = protask_daily_report
- ●Webhook signature checkMETA_APP_SECRET
- ●Who gets real messagesNobody yet — WHATSAPP_ALLOWED_NUMBERS=none, all sends are logged only
- ●Claude AI analysisANTHROPIC_API_KEY required — replies wait until it is set
Webhook URL (Meta App → WhatsApp → Configuration)
https://protask.cerebrotech.in/api/whatsapp/webhookVerify token: value of WHATSAPP_VERIFY_TOKEN · subscribe to the “messages” field