PTProTaskProduction tracker

WhatsApp

Follow-ups at 18:00 · replies collected 17:00–21:00 · processed at 21:00 (IST)

Submitting the templates

  1. Meta Business Suite → WhatsApp Manager → Message templates → Create template.
  2. Category Utility, name exactly as below, language English.
  3. Paste the body, add the footer and the quick-reply button, then fill the sample values (Meta needs them for review).
  4. After approval, set the env vars on the server (/root/protask/.env.production) and run pm2 restart protask --update-env.

Templates are needed because these messages start the conversation. Receipts and the 9 pm confirmations are normal messages — they go out within 24 h of the person writing to us.

protask_daily_updateset WHATSAPP_TEMPLATE_NAME

Evening follow-up to every assignee — numbered task list, delayed tasks called out so they give a reason.

Category: UtilityLanguage: English (en)Quick reply: Sab ho gaya ✅
Body (paste into Meta)
Hello {{1}}, apne kaam ki update do.

Kaam: {{2}}

Late: {{3}}

9 baje tak reply karo.
Preview with sample values
Hello Suresh, apne kaam ki update do. Kaam: 1) Panel GA drawing (EOT-2026-041) · 2) Girder fit-up & welding (EOT-2026-041) [b. Box closing, c. Longitudinal welding, d. Camber check] · 3) Weld inspection (EOT-2026-041) [a. Visual, b. DPT, c. UT report] Late: 3) Weld inspection — 2 din late 9 baje tak reply karo.
Sab ho gaya ✅
Sample values for review
  1. {{1}} First name: Suresh
  2. {{2}} Numbered task list, one line — open steps lettered in [ ]: 1) Panel GA drawing (EOT-2026-041) · 2) Girder fit-up & welding (EOT-2026-041) [b. Box closing, c. Longitudinal welding, d. Camber check] · 3) Weld inspection (EOT-2026-041) [a. Visual, b. DPT, c. UT report]
  3. {{3}} Delayed tasks with days late, or “Kuch nahi”: 3) Weld inspection — 2 din late
protask_daily_reportset WHATSAPP_REPORT_TEMPLATE_NAME

Evening report to managers (people with “send daily report” ticked).

Category: UtilityLanguage: English (en)
Body (paste into Meta)
Aaj ki production report ({{1}})

Progress: {{2}}
Dhyan do: {{3}}

Poori report dashboard pe hai.
Preview with sample values
Aaj ki production report (21 Oct) Progress: 17/43 kaam pure (40%), 3 aaj pure hue Dhyan do: 3 late, 1 ruka hua, 6/7 ne reply kiya Poori report dashboard pe hai.
Sample values for review
  1. {{1}} Date: 21 Oct
  2. {{2}} Completion summary: 17/43 kaam pure (40%), 3 aaj pure hue
  3. {{3}} Overdue / blocked / replies: 3 late, 1 ruka hua, 6/7 ne reply kiya